Reference · The companies
MARA Holdings: The Mine the Neighbors Could Hear
Every Bitcoin mine in Texas makes a sound. One of them made a magazine story, a county resolution, a jury trial, three lawsuits, and an election. The company that owns it is a Florida patent-licensing firm that turned to mining in 2017, lent sixty-seven million dollars in 2021 to build a three-hundred-megawatt site behind a gas plant outside Granbury, watched the builder go bankrupt and two operators come and go, and bought the site in January 2024 with a $1.9 million sound wall already written into the purchase agreement and a statement that it had not known about the noise. It has since turned off ninety-five containers, sunk two-thirds of its rigs in oil, built the wall out to two thousand feet, published surveys putting every reading below the legal line, won an acquittal for its site manager, sued a county to stop a vote, and won that vote at the polls. The neighbors are still in court. Around Granbury the company has built one of the largest bitcoin treasuries in the world and then sold a third of it, bought a wind farm and a gas plant, and signed for two gigawatts on the Gulf Coast. The mine, the town, and the numbers are the record.
By TexasBitcoin · Published September 26, 2026 · Updated September 26, 2026
The short answer
MARA Holdings is the Nasdaq-listed Bitcoin miner, headquartered in Florida and led by Fred Thiel, that owns the roughly 300-megawatt Granbury mine behind Constellation's Wolf Hollow gas plant in Hood County, a 200-megawatt site at Garden City, and a Panhandle wind farm, and has agreed to build two gigawatts in Matagorda County. Since buying Granbury in January 2024 it has faced a state nuisance suit seeking an injunction, two federal damages suits, more than thirty-five noise citations, a county resolution to the Legislature, and a residents' attempt to incorporate a city around the site, which MARA sued to stop and voters rejected 86 to 52 in November 2025. It curtailed about 550 megawatts in Winter Storm Fern, holds 35,577 bitcoin after selling down a 53,822-coin treasury, and reported a $1.31 billion net loss for 2025.
Key facts
- MARA lent Compute North up to $67 million in May 2021 to build the 300-megawatt Granbury site, and bought it on January 12, 2024 for $189.6 million with a Nebraska site.[5][11][39]
- The December 2023 purchase agreement named a $1.9 million sound wall; MARA said in January 2024 that “prior to the purchase, we were not aware of the noise issues.”[17]
- Citizens Concerned About Wolf Hollow sued MARA for private nuisance in Hood County on October 4, 2024, seeking a permanent injunction and no damages; the case was remanded from federal court March 27, 2025.[24][29]
- MARA sued Hood County on October 29, 2025 to stop the Mitchell Bend incorporation vote; a restraining order was denied and the vote failed 86 to 52 on November 4, 2025.[35][36][37]
- MARA curtailed about 550 megawatts in ERCOT during Winter Storm Fern in January 2026 and states it does “not receive significant compensation for curtailment.”[47][39]
- MARA held 53,822 bitcoin on December 31, 2025 and 35,577 on June 30, 2026, having sold about 15,000 in March to retire $1 billion of convertible notes.[39][40][46]
From the patent shell to the Gulf Coast
2010 → 2026- The shell
A patent troll becomes a pure play
Marathon Patent Group is founded in Fort Lauderdale in February 2010 and spends its first years suing Microsoft, Google, Amazon, and Apple through a subsidiary; in November 2017 it pivots to mining, and in February 2021 renames itself Marathon Digital Holdings - "one of the only pure-play Bitcoin investment options available," the chairman says. Fred Thiel becomes chief executive on April 26, 2021. A month later the company signs a letter of intent with Compute North for a 300-megawatt site in Texas and lends the builder up to $67 million to put it up. The site is Granbury. [1][2][3][4][5]
- Texas
The subpoena, the coal plant, and the builder's bankruptcy
MARA discloses an SEC subpoena in November 2021 over its Hardin, Montana deal and a six-million-share issuance; in April 2022 it announces it will leave the revived coal plant "to become carbon neutral by end of 2022," and critics note the rigs are going to a Texas gas plant. On September 22, 2022 Compute North - which built Granbury and hosted most of MARA's fleet at King Mountain - files for bankruptcy, and MARA reports about $80 million of exposure. In February 2023 it restates its 2021 accounts. It ends 2022 with a net loss of $687 million. [6][7][8][9]
- Texas
"1751 won't change our minds about Texas"
As Kolkhorst's brake on the miners passes the Senate, Thiel tells Decrypt it "won't change our minds about Texas" and that "I don't think it's going to make it out of the House intact" - the House being "much more aligned with the positive aspects and the benefits of bitcoin mining." It does not make it out. A company representative says MARA "voluntarily curtails operations to support the grid," with revenue from it "immaterial." [10]
- Granbury
MARA buys Granbury, and the neighbors have already been calling
On December 19, 2023 MARA agrees to buy Granbury and a Nebraska site, 390 megawatts for $178.6 million, from Generate Capital; the deal closes January 12, 2024 at $189.6 million. The purchase agreement names a $1.9 million sound wall; residents had been complaining to the constable since December, one had recorded 103 decibels, and the operator had built a wall around 46% of the fence line in November. MARA's spokesman: the company was unaware of the noise before buying and has commissioned a study; "There are people who are upset by this, and we need to go fix it." In February it takes over operations from Hut 8 for a $13.5 million fee; in April it buys Garden City, 200 megawatts in Glasscock County, from Applied Digital for $96.8 million. [11][17][12][13][14][15]
- Granbury
TIME, the acquittal, and the county's plea to the Legislature
On July 8 TIME publishes "We're Living in a Nightmare": more than forty residents, 72 decibels in a child's bedroom, a retired pastor with a pacemaker, two ear specialists, and a constable who has recorded more than 85 decibels over thirty-five times and written $17,500 in citations. On July 11 a Hood County jury acquits MARA's site manager on twelve of them - jurors "had trouble connecting it to Fischer personally," the county attorney says. On July 23 the commissioners court asks the Legislature to make noise a statutory nuisance, allow escalating penalties, and reintroduce SB 1751. MARA's own July survey reports every point below 63 decibels, down from 78, with fans shut and rigs going into oil. [17][18][19][20][21]
- The treasury
The suit, the rename, and a billion dollars of bitcoin
Marathon becomes MARA Holdings on August 29. On October 4 the Citizens Concerned About Wolf Hollow, represented by Earthjustice, file in Hood County for a permanent injunction - no damages - against "unreasonable noise and vibrations"; the verified petition records 88 decibels at 4:58 in the morning and a home turned into "a prison." MARA removes the case to federal court. In November it adopts a full-hold policy and sells $1 billion of zero-coupon convertible notes to buy bitcoin, then $850 million more; in December it buys a 114-megawatt wind farm in Hansford County to run old rigs on power "that would have otherwise been curtailed." It ends the year with 44,893 bitcoin and a $541 million profit on the fair-value rule. [22][24][25][26][27][28]
- Granbury
Remanded, not dismissed; the neighbors ask for the data
A federal judge sends the nuisance case back to Hood County on March 27, 2025. MARA's motion to dismiss is denied over the summer; on September 3 Earthjustice moves to compel the company's equipment lists, mitigation records, and noise data. By October the Tribune counts 95 containers deactivated, a 2,000-foot wall, and 67% of the site in immersion; the county's own study finds about 60 decibels at the fence and 35 to 53 in the neighborhoods. MARA: "more than $1.2 billion" invested in Texas. Thiel's 2024 pay is disclosed at about $43 million. [29][33][34][30]
- Granbury
Mitchell Bend: a town tries to incorporate, and MARA sues to stop the vote
About 600 residents petition to incorporate two square miles around the mine as the city of Mitchell Bend; the county judge rejects the petition, then accepts it. On October 29 MARA sues Hood County, its judge, its attorney, and its elections administrator in federal court, calling the election "an intentional and unconstitutional use of local government authority to favor a small group of citizens." Judge O'Connor denies a restraining order on November 3 - no "substantial threat of irreparable harm." On November 4 the incorporation fails, 86 to 52. MARA: voters "saw through the sham incorporation effort." A plaintiff: "What we want to do is get back and preserve the peace we had, it's that simple." Thiel, the week after: "By 2028, you'll either be a power generator, be owned by one, or be partnered with one." [32][35][36][37][38]
- The treasury
Fern, the treasury sold, a gas plant bought, nine more plaintiffs
In Winter Storm Fern MARA "voluntarily curtailed approximately 550 MW" in ERCOT. Its 2025 report shows 53,822 bitcoin, 66.4 exahash, a $1.31 billion net loss on the fair-value rule, Granbury at 300 megawatts and 12.3 exahash "among the first of our sites where we have begun integrating inference" - and no Granbury lawsuit among its legal proceedings. In March it sells 15,133 bitcoin to retire a billion dollars of the notes it had sold to buy them; in April it agrees to buy a 505-megawatt gas plant in Ohio for about $1.5 billion. On May 1 nine Granbury property owners file a second federal suit for damages of up to $10 million. Thiel: "a redefining quarter, not an incremental one." [47][39][40][42][43][44]
- The watch
Two gigawatts on the Gulf, and the audit MARA welcomed
On July 9 MARA signs for 1,200 acres in Matagorda County with HIF USA: a gigawatt by October 2027, two by April 2028, up to $600 million contingent on ERCOT approval. On August 10 it commits to the Governor's data-center standards - "These are not new commitments we are making in response to this review" - and Thiel tells analysts the audit will flush out phantom requests. In September ERCOT's Batch Zero classifies Granbury's 280 megawatts and Garden City's 200 as base load and Matagorda as studied. The company holds 35,577 bitcoin, runs 70.3 exahash, and has 386 million shares - four and three-quarters times the 82 million of 2020. [45][47][48][46]
Where did MARA come from?
From the business of suing over patents. Marathon Patent Group was founded in Fort Lauderdale in February 2010 and made its money through a subsidiary that sued Microsoft, Google, Amazon, and Apple – the model the industry calls a patent troll.[1] On November 2, 2017 it agreed to buy a Quebec GPU-mining company and became a crypto stock; in February 2021 it renamed itself Marathon Digital Holdings – “one of the only pure-play Bitcoin investment options available,” its chairman said – and on April 26, 2021 Fred Thiel, a director, became chief executive.[2][3][4] The company disclosed an SEC subpoena that November over a Montana coal-plant venture and a six-million-share issuance, left the coal plant in 2022 “to become carbon neutral,” restated its 2021 accounts in February 2023, and was renamed MARA Holdings on August 29, 2024; its 2025 annual report lists no SEC matter among its proceedings, and the securities class action over its accounting was dismissed with prejudice in 2026.[6][7][9][22][39][50] Its principal office is in Hallandale Beach, Florida; it employed about 266 people at the end of 2025.[39] Its largest owned region, by its own description, is Central Texas.
How did MARA come to own Granbury?
It paid for the site twice – once to build it, once to buy it. On May 24, 2021 Marathon signed a letter of intent with Compute North for a new 300-megawatt facility in Texas to host some 73,000 of its miners, and lent the builder up to $67 million over eighteen months to construct it.[5] The site was Granbury, behind Constellation's 1,115-megawatt Wolf Hollow II gas plant in Hood County, and it began operating in the summer of 2022 with, by TIME's count, 163 containers and more than 30,000 machines.[17] Compute North filed for bankruptcy on September 22, 2022, and MARA reported about $80 million of exposure – preferred stock, a note, and some $50 million of deposits at Granbury and King Mountain, of which it recovered most.[8] US Bitcoin Corp operated the site from late 2022, built a 24-foot wall around about 46% of its perimeter in November 2023, and merged into Hut 8; on December 19, 2023 MARA agreed to buy Granbury and a Nebraska site, 390 megawatts in all, for $178.6 million from Generate Capital, and closed on January 12, 2024 at $189.6 million.[24][11][39] On February 1 it announced it would take over operations from Hut 8 for a $13.5 million fee – “fully recognize the operational and economic benefits of owning these assets,” Thiel said – and on April 1 it bought Garden City, 200 megawatts in Glasscock County, from Applied Digital for $96.8 million.[14][15][39] Its 2025 report describes Granbury at “approximately 300 megawatt,” 12.3 exahash, “among the first of our sites where we have begun integrating inference capabilities,” and its other Central Texas sites at about 250 megawatts, with a wind farm in the Panhandle it bought in February 2025 to run old rigs on power “that would have otherwise been curtailed.”[39][27] Where Granbury sits among the state's mines is on the Texas Bitcoin mining map.
What did the neighbors hear?
Fans, from a quarter-mile away, at night. The verified petition later filed against MARA records what three residents heard and when: a sound first noticed in the spring of 2023 at “a 4 of 10,” worsening through the fall and winter to 9 or 10, with phone readings of 88 decibels at 4:58 in the morning; one of them began calling the constable, the sheriff, and her commissioner in December 2023, and the press in February.[24] TIME reported in February 2024 on a reading of 103 decibels and MARA's statement that it had been unaware of the noise at purchase and had commissioned a study; DL News that month quoted the company's spokesman: “I'm not aware of anyone ever having medical issues from a Bitcoin mining site,” and “There are people who are upset by this, and we need to go fix it.”[12][13] On July 8, 2024 TIME published “We're Living in a Nightmare”: more than forty residents interviewed, 72 decibels measured in a child's bedroom, a 77-year-old retired pastor with heart failure and a pacemaker, two ear specialists describing patients, and a constable who had recorded more than 85 decibels over thirty-five times that year and written $17,500 in citations under the Penal Code's disorderly-conduct provision, which presumes noise above 85 unreasonable after an officer's warning and caps each fine at $500. The story also reported that MARA's December 2023 purchase agreement “clearly mentions the existence of the $1.9 million ‘sound wall,’” beside the company's line: “Prior to the purchase, we were not aware of the noise issues.”[17] “Nobody in their right mind would live here,” Cheryl Shadden told the Tribune two days later. “My windows rattle.”[18] On July 11 a Hood County jury acquitted MARA's site manager, David Fischer, on twelve of the citations; the county attorney said jurors “had trouble connecting it to Fischer personally.”[19] On July 23 the commissioners court passed a resolution asking the Legislature to make noise a statutory nuisance, to allow escalating penalties, and to reintroduce Kolkhorst's SB 1751, with copies to the county's senator and representative. Texas counties cannot pass noise ordinances; the Legislature did nothing with the request in 2025.[20][34] The senator whose bill the county wanted back is on Lois Kolkhorst and Bitcoin.
What did MARA do, and what did the neighbors do?
MARA turned things off and built things up; the neighbors sued, and then tried to become a city. By the company's own survey of July 18, 2024, all eleven measured points were below 63 decibels, down from 78 before it took over; it reported 70 to 90 air-cooled containers deactivated by July and more than a hundred by December, immersion cooling rising from 20% to 50%, a sound wall begun in August and finished in October, and trees planted in November – “well below the state and county law sound limit of 85 decibels.”[21] By October 2025 the Tribune counted 95 containers off, a wall 2,000 feet long, and 67% of the site in oil, and a county-funded study found about 60 decibels at the fence and 35 to 53 in the neighborhoods.[34] On October 4, 2024 the Citizens Concerned About Wolf Hollow – an association of more than two dozen residents founded that year by Shadden – filed a verified petition in Hood County district court, represented by Earthjustice, for a single cause of private nuisance and a single remedy: a permanent injunction against “any unreasonable noise and vibrations,” with no money damages, a jury demanded. The petition describes homes “turning their refuge into a prison” and a partial wall that “actually causes the sound to be amplified.”[24] “No corporation has the right to subject their neighbors to conditions that jeopardize their health and well-being,” Earthjustice's Rebecca Ramirez said; Shadden: “Day and night, we are subjected to relentless noise that is physically harming us.”[25] MARA removed the case to federal court on diversity grounds; the court remanded it on March 27, 2025; MARA's motion to dismiss was denied that summer, and on September 3, 2025 the plaintiffs moved to compel its equipment lists, mitigation records, and noise data.[29][33] Then the city. About 600 residents petitioned to incorporate two square miles around the mine as Mitchell Bend – a city could pass the noise ordinance the county could not; on October 29, 2025 MARA sued Hood County, its judge, its attorney, and its elections administrator, calling the vote “an intentional and unconstitutional use of local government authority to favor a small group of citizens” that “seeks only to target specific businesses – including MARA – with punitive taxes and restrictive ordinances.”[32][35] Judge Reed O'Connor denied a restraining order on November 3 – no “substantial threat of irreparable harm” – and Shadden said, “We just want to sleep in our beds in peace at night.”[36] On November 4 the incorporation failed, 86 votes to 52. MARA: voters “saw through the sham incorporation effort and rejected it at the ballot box.” Thomas Weeks, a plaintiff: “What we want to do is get back and preserve the peace we had, it's that simple.”[37] On May 1, 2026 nine property owners living from a hundredth of a mile to nine-tenths of a mile from the fence filed a second federal suit, for nuisance, negligence, and emotional distress, seeking up to $10 million; MARA: “We are committed to being thoughtful and considerate members of our new community.”[43] Its 2025 annual report, filed in March 2026, lists none of the Granbury cases among its legal proceedings.[39]
What is MARA's record with the grid and the state?
Curtailment without compensation, by its own account, and politics at arm's length. When Kolkhorst's brake on the miners passed the Senate in April 2023, Thiel told Decrypt it “won't change our minds about Texas” and that “I don't think it's going to make it out of the House intact” – the House being “much more aligned with the positive aspects and the benefits of bitcoin mining.” It did not.[10] A company representative said then that MARA “voluntarily curtails operations to support the grid” with revenue that was “immaterial,” and its 2025 annual report keeps the line: “Although we do not receive significant compensation for curtailment, the dispatchable load of our Bitcoin mining operations helps balance the grid,” at an average energy cost of four cents per kilowatt-hour at owned sites.[39]In Winter Storm Fern in January 2026 it “voluntarily curtailed approximately 550 MW” in ERCOT, out of the 4,100 the operator reported mines shedding.[47] The company is among the Texas Blockchain Council's largest funders; no testimony by it on SB 1751 or SB 6 has been located, nor any Texas lobbyist registration.[49] On the state's reserve Thiel has been arch rather than opposed – a reserve is “an empty statement unless you start putting stuff into it,” he said of the federal one, suggesting the government mine its own.[31] When the Governor ordered his audit of the queue in August 2026 MARA committed to his standards within a week – “These are not new commitments we are making in response to this review” – and Thiel told analysts the audit would flush out phantom requests to his company's benefit; ERCOT's Batch Zero then classed Granbury's 280 megawatts and Garden City's 200 as base load and the two gigawatts MARA signed for in Matagorda County on July 9 – a gigawatt by October 2027, two by April 2028, up to $600 million contingent on approval – as studied.[47][45][48] The operator that counts those megawatts is on ERCOT and Bitcoin; the regulator running the audit is on the Public Utility Commission and Bitcoin.
What are the numbers?
Large, and moving both ways. MARA's energized hashrate went from 7 exahash at the end of 2022 to 24.7, 53.2, and 66.4 at the ends of the next three years, and 70.3 in mid-2026 – about eight percent of the network.[28][39][46] Its treasury went the other way. In November 2024 it adopted a full-hold policy and sold $1 billion of zero-coupon convertible notes, then $850 million more, to buy bitcoin, reaching 44,893 coins at the end of 2024 and 53,822, worth $4.7 billion, at the end of 2025.[26][28][39] In March 2026 it sold 15,133 of them to buy back a billion dollars of those notes at a discount – “we captured approximately $88 million in value,” Thiel said – and by June 30 held 35,577, about $2.1 billion, having sold some $1.5 billion of bitcoin in six months as it turned toward AI infrastructure: “a redefining quarter, not an incremental one.”[40][46][44] In April it agreed to buy Long Ridge Energy, a 505-megawatt gas plant in Ohio, for about $1.5 billion including assumed debt – the strategy Thiel had stated in November 2025: “By 2028, you'll either be a power generator, be owned by one, or be partnered with one.”[42][38] The income statement follows the bitcoin price through the fair-value rule: a net loss of $687 million in 2022, income of $261 million in 2023 and $541 million in 2024, a loss of $1.31 billion in 2025 on revenue of $907 million, and a loss of $611 million in the second quarter of 2026.[28][39][46] Shares outstanding went from 82 million at the end of 2020 to 386 million in July 2026.[46] Thiel was paid about $43 million for 2024, with performance units at their 200% maximum, and about $27 million for 2025, including $4.3 million of personal security.[30][41] The miner whose numbers make the closest comparison is on Riot Platforms and Texas.
The honest counterweight: the wall in the contract, the readings, and the ledger
Three things, and the first is a document. MARA's purchase agreement of December 2023 named a $1.9 million sound wall; MARA's statement of January 2024 was that it had not known about the noise. Both are in TIME's reporting, and the page leaves them side by side.[17] Second, the readings, which cut the other way. Every number MARA has published since it took over is below the state's 85-decibel line, and the county's own study put the fence at about 60 and the neighborhoods in the 35-to-53 range – ordinary suburban sound levels – after 95 containers were shut, two-thirds of the site went to immersion, and the wall reached 2,000 feet.[21][34] The jury that heard the citations acquitted the man charged; the federal judge who heard MARA's case against the election found no irreparable harm to MARA, and the voters found no majority for the city. The neighbors' case is that a mine audible at a quarter-mile at four in the morning is a nuisance whatever the meter says, and no court has yet ruled on it; the nuisance suit has survived dismissal and is in discovery, the damages suit is new, and MARA's annual report treats all of it as immaterial. Third, the ledger. The company's profits are the bitcoin price's; its treasury was built with borrowed money and sold down a third when the price fell; its shares have been multiplied nearly five-fold; its chief executive's pay in two years exceeds seventy million dollars; and the Granbury mine, at 12.3 of its 70 exahash, is a fraction of a company whose future, on its own telling, is gas plants and data centers rather than fans.[39][46][41] Two things this page does not say: Riot's Rockdale is not MARA's, and the Constellation peaker proposed next to the mine is Constellation's, barred by its own account from serving the mine.[23]
The fair reading is that MARA inherited a noise problem it had financed, fixed it to the standard the law sets, and has not fixed it to the standard the neighbors live by – and that the gap between those two standards is what a Hood County jury will eventually be asked to measure. Until then the mine runs, the wall stands, and the company has already decided it would rather own a power plant.
Where does MARA stand today?
As of September 2026: about 300 megawatts at Granbury and 200 at Garden City classed as base load, two gigawatts in Matagorda County classed as studied, a gas plant in Ohio awaiting closing, 35,577 bitcoin, 70 exahash, a state nuisance suit in discovery with no trial date, a federal damages suit four months old, a $138.8 million contract verdict on appeal, and a chief executive who says the miner that survives 2028 will be a power company.[48][45][42][46][33][43][39][38] The other company in the wing is on Riot Platforms and Texas; the county's senator is on Lois Kolkhorst and Bitcoin; the sites are on the Texas Bitcoin mining map. This page is the mine the neighbors could hear, and what has been done about it in two years by everyone but the Legislature.
Frequently asked questions
What is MARA Holdings?
A Hallandale Beach, Florida company, listed on Nasdaq as MARA, founded in 2010 as Marathon Patent Group, a patent-licensing firm; it pivoted to Bitcoin mining in November 2017, became Marathon Digital Holdings in March 2021, and MARA Holdings in August 2024. Fred Thiel has been chief executive since April 2021 and is also chairman. It ran about 70 exahash in mid-2026, among the largest miners in the world, and held 35,577 bitcoin. In Texas it owns the roughly 300-megawatt Granbury site behind Constellation's Wolf Hollow gas plant, a 200-megawatt site at Garden City, a wind farm in Hansford County, and, under agreement, a two-gigawatt site in Matagorda County.
What is the Granbury noise dispute?
Residents living within a mile of MARA's Granbury mine - built in 2022 by Compute North with MARA's loan, run by two other operators, and bought by MARA in January 2024 - reported that its cooling fans produced sound in the 80s and above 100 decibels at their homes, with sleep loss, migraines, and hypertension. TIME reported on more than forty of them in July 2024; a Hood County constable issued more than thirty-five citations above 85 decibels; a jury acquitted the site manager on twelve of them in July 2024. In October 2024 a residents' association represented by Earthjustice sued MARA for private nuisance in Hood County, seeking a permanent injunction and no damages. MARA removed the case to federal court, which sent it back in March 2025; its motion to dismiss was denied. Nine property owners filed a separate federal damages suit in May 2026. No trial date has been reported.
What has MARA done about the noise?
By its own account and the Tribune's: shut down 95 air-cooled containers, moved about 67% of the site to immersion cooling, and completed a 24-foot sound wall extended to 2,000 feet by October 2024. MARA's July 2024 survey found all eleven measured points below 63 decibels, down from 78 before it took over; a county-funded study found about 60 decibels at the fence and 35 to 53 in the neighborhoods. Texas's legal threshold under the Penal Code is 85. The neighbors say the sound remains audible and physically harmful; the litigation continues.
What was the Mitchell Bend vote?
An attempt by about 600 residents to incorporate two square miles around the mine as a city, which would have let them pass a noise ordinance that Texas counties cannot. MARA sued Hood County, its judge, its attorney, and its elections administrator in federal court on October 29, 2025, calling the election 'an intentional and unconstitutional use of local government authority to favor a small group of citizens'; Judge Reed O'Connor denied a restraining order on November 3. The vote on November 4, 2025 failed, 86 to 52. MARA said voters 'saw through the sham incorporation effort.'
How is MARA doing as a business?
Its results swing with the accounting rule that marks bitcoin to market: net income of $261 million in 2023 and $541 million in 2024, a net loss of $1.31 billion in 2025 and $611 million in the second quarter of 2026 alone. It sold $1 billion and $850 million of zero-coupon convertible notes in late 2024 to buy bitcoin under a full-hold policy, reached 53,822 coins, then sold about 20,000 in early 2026 to retire a billion dollars of that debt and fund a turn toward AI infrastructure, including a $1.5 billion gas plant in Ohio. Shares outstanding rose from 82 million in 2020 to 386 million in 2026. Thiel's compensation was about $43 million for 2024 and $27 million for 2025, including $4.3 million of security.
Sources
Primary record first: the company's own SEC filings, releases, shareholder letters, and proxy statements; the verified petition and the Earthjustice filings; the Hood County commissioners' resolution; the federal docket as published; ERCOT's notices; then TIME, the Texas Tribune, KERA, DL News, Decrypt, CoinDesk, and the trade press for the quotes, the readings, and the vote. Machine counts at Granbury differ by source and are attributed where used. This is a research and reference article, not financial, investment, or legal advice.
- [1]Wikipedia - MARA Holdings: founded February 23, 2010 as Marathon Patent Group, Fort Lauderdale; the Uniloc patent suits; the 2017 pivot to mining
- [2]Marathon Patent Group - Marathon to acquire Global Bit Ventures (November 2, 2017): the pivot to cryptocurrency mining
- [3]Marathon Patent Group - Name change to Marathon Digital Holdings (February 26, 2021): Okamoto - "one of the only pure-play Bitcoin investment options available"
- [4]Marathon Digital - Marathon appoints Fred Thiel chief executive officer (April 26, 2021)
- [5]GlobeNewswire - Marathon Digital signs binding LOI with Compute North for a new 300 MW Texas facility (May 24, 2021): about 73,000 miners; an 18-month bridge loan of up to $67 million to build it
- [6]CoinDesk - Marathon discloses SEC subpoena over Hardin, Montana deal (November 15, 2021)
- [7]GlobeNewswire - Marathon to exit Hardin, Montana coal plant "to become carbon neutral by end of 2022" (April 5, 2022)
- [8]MARA - Form 10-Q for the third quarter of 2022: about $80 million of exposure to Compute North's bankruptcy - $10 million preferred, a $21.3 million note, about $50 million in deposits at King Mountain and Wolf Hollow
- [9]MARA - Form 8-K (February 28, 2023): non-reliance on the 2021 annual report and the 2021–22 interim statements; the restatement
- [10]Decrypt - Marathon Digital CEO: Texas mining bill "won't change our minds about Texas" (April 14, 2023): Thiel - "I don't think it's going to make it out of the House intact"
- [11]Marathon Digital - Marathon to acquire two operational sites totaling 390 MW for $178.6 million (December 19, 2023): Granbury, Texas and Kearney, Nebraska, from Generate Capital
- [12]TIME - Bitcoin mining noise in Texas (February 1, 2024, updated January 2026): Shadden's 103-decibel reading; Schumacher - the company was unaware of the noise at purchase and commissioned a sound study
- [13]DL News - Granbury, Texas residents under "aural attack" from Bitcoin mine (February 19, 2024): about 80,000 fan-cooled computers; eight citations; Schumacher - "I'm not aware of anyone ever having medical issues from a Bitcoin mining site"; "There are people who are upset by this, and we need to go fix it"
- [14]Marathon Digital - Marathon to take over operations at Granbury and Kearney from Hut 8 (February 1, 2024): Thiel - "fully recognize the operational and economic benefits of owning these assets"; a $13.5 million fee
- [15]Applied Digital - Applied Digital to sell its Garden City, Texas facility to Marathon (March 15, 2024): 200 MW nameplate
- [16]Marathon Digital - Marathon announces Kaspa mining operations (June 26, 2024): about 60 PH/s, 30 live "in the company's self-owned and operated facilities in Texas"
- [17]TIME - "We're Living in a Nightmare": inside the health crisis of a Texas Bitcoin town (July 8, 2024, Andrew R. Chow): forty-plus residents; 72 decibels in a child's bedroom; the constable's thirty-five-plus readings above 85; the $1.9 million sound wall in the purchase agreement; "Prior to the purchase, we were not aware of the noise issues"
- [18]Texas Tribune - A Bitcoin mine's noise, the power grid, and the Legislature (July 10, 2024): Shadden - "Nobody in their right mind would live here. My windows rattle"; Crawford on the phased plan; Patrick - "the Wild Wild West"
- [19]Decrypt - Texas jury sides with Bitcoin miner Marathon in "nightmare" noise dispute (July 2024): site manager David Fischer acquitted on twelve citations; County Attorney Mills - jurors "had trouble connecting it to Fischer personally"
- [20]Hood County Commissioners Court - Resolution on Bitcoin mine noise (July 23, 2024, PDF): asks the Legislature to add noise to the nuisance statute, allow escalating penalties, and reintroduce SB 1751; copies to Senator Birdwell and Representative Slawson
- [21]MARA Granbury - Sound survey results for MARA's Granbury data center (July–November 2024): all eleven points below 63 decibels, down from 78; containers deactivated; immersion 20% to 50%; the wall completed October 2024
- [22]MARA - Form 8-K (August 29, 2024): Marathon Digital Holdings renamed MARA Holdings, Inc.
- [23]Texas Tribune - Constellation's proposed Wolf Hollow expansion beside the Granbury Bitcoin mine (September 12, 2024): a 300 MW peaker; new power barred from "directly serving industrial load"
- [24]Citizens Concerned About Wolf Hollow v. Marathon Digital Holdings - first verified petition, Hood County District Clerk no. C2024253 (October 4, 2024, PDF): private nuisance; a permanent injunction, no damages; 88 dBZ at 4:58 a.m.; "turning their refuge into a prison"; the partial wall covering "roughly 46% of the property's perimeter"
- [25]Earthjustice - Granbury residents sue local Bitcoin mine over health-threatening noise pollution (October 7, 2024): Ramirez - "No corporation has the right to subject their neighbors to conditions that jeopardize their health and well-being"; Shadden - "Day and night, we are subjected to relentless noise that is physically harming us"
- [26]MARA - Form 8-K exhibit (November 2024): the $1.0 billion zero-coupon convertible notes due 2030 to buy bitcoin
- [27]MARA - MARA acquires wind farm (December 3, 2024): 114 MW nameplate in Hansford County; Thiel - "renewable resources that would have otherwise been curtailed"
- [28]MARA - Full-year 2024 results (February 26, 2025): 53.2 EH/s; 44,893 bitcoin held; net income $541 million
- [29]GovInfo - Citizens Concerned About Wolf Hollow v. Marathon Digital Holdings, N.D. Tex. 4:24-cv-00983: removed to federal court; remanded to Hood County March 27, 2025
- [30]MARA - 2025 proxy statement (April 30, 2025): Thiel's 2024 compensation about $43.2 million; performance units paid at the 200% maximum
- [31]CoinDesk - MARA's Fred Thiel says the U.S. should start mining bitcoin to fill the strategic reserve (May 27, 2025): "an empty statement unless you start putting stuff into it"
- [32]KERA - Hood County residents vote to incorporate around the Bitcoin mine (August 18, 2025): Mitchell Bend; about 600 residents
- [33]Earthjustice - Granbury residents demand answers from MARA's Bitcoin mine as nuisance lawsuit continues (September 3, 2025): the motion to dismiss denied; the motion to compel; Cantú - "the constant, harmful noise from MARA's cryptomining plant"
- [34]Texas Tribune - Hood County residents try to incorporate a city to fight the Bitcoin mine's noise (October 9, 2025): 95 containers deactivated, a 2,000-foot wall, 67% immersion; the county study's 60 decibels near the site; MARA's "more than $1.2 billion" in Texas; Lakey - "we're getting really good at fighting Goliath"
- [35]KERA - MARA sues Hood County over the Mitchell Bend incorporation election (October 30, 2025): "an intentional and unconstitutional use of local government authority to favor a small group of citizens"
- [36]KERA - Judge denies MARA's bid to halt the Mitchell Bend vote (November 3, 2025): Judge O'Connor found no "substantial threat of irreparable harm"; Shadden - "We just want to sleep in our beds in peace at night"
- [37]Texas Tribune - Hood County residents' vote to incorporate against the Bitcoin mine fails (November 5, 2025): 86 to 52; MARA - "saw through the sham incorporation effort"; Weeks - "preserve the peace we had, it's that simple"
- [38]CoinDesk - Bitcoin miners must own power or die trying before the next halving, MARA CEO says (November 11, 2025): "By 2028, you'll either be a power generator, be owned by one, or be partnered with one"
- [39]MARA - Form 10-K for 2025 (March 2, 2026): Hallandale Beach, Florida; Granbury "approximately 300 megawatt" and 12.3 EH/s, "among the first of our sites where we have begun integrating inference"; other Central Texas sites about 250 MW; a wind farm in North Texas; 66.4 EH/s; 53,822 bitcoin; net loss $1.31 billion; "we do not receive significant compensation for curtailment"; the Garden City storm impairment of $26 million; the Granbury suits not listed among legal proceedings; Ho's $138.8 million verdict on appeal
- [40]MARA - MARA repurchases $1 billion of convertible notes (March 26, 2026): 15,133 bitcoin sold; Thiel - "we captured approximately $88 million in value"
- [41]MARA - 2026 proxy statement (April 30, 2026): Thiel's 2025 compensation about $27.1 million; $4.3 million of security including an armored vehicle; ratio 134 to 1
- [42]MARA - Form 8-K (April 30, 2026): the Long Ridge Energy agreement - a 505 MW gas plant in Hannibal, Ohio, about $1.5 billion including assumed debt
- [43]Decrypt - Nine Texas residents sue MARA over Granbury noise (May 2026): the federal damages suit before Judge O'Connor - nuisance, negligence, emotional distress, up to $10 million; MARA - "thoughtful and considerate members of our new community"
- [44]CoinDesk - MARA sold $1.5 billion of bitcoin as it shifts toward AI infrastructure (May 12, 2026): Thiel - "a redefining quarter, not an incremental one"
- [45]MARA - MARA signs definitive agreement for a 2 GW site in Matagorda County, Texas (July 9, 2026): with HIF USA; 1 GW by October 2027, 2 GW by April 2028; Thiel - "strategically located infrastructure assets capable of supporting high-performance compute and bitcoin workloads"
- [46]MARA - Second-quarter 2026 shareholder letter (August 6, 2026): 70.3 EH/s; 35,577 bitcoin, about $2.1 billion; net loss $611.3 million; 386 million shares
- [47]POWER - More data-center operators commit to Abbott's Texas standards (August 10, 2026): MARA "voluntarily curtailed approximately 550 MW" in Winter Storm Fern; "These are not new commitments we are making in response to this review"
- [48]The Energy Mag - MARA's Matagorda site classified as studied load; Granbury 280 MW and Garden City 200 MW as base load in ERCOT's Batch Zero (September 2026)
- [49]CoinDesk - Eight U.S. blockchain lobby groups unite (January 15, 2025): MARA among the Texas Blockchain Council's biggest financial contributors
- [50]Paul, Weiss - MARA wins dismissal with prejudice of securities class action over bitcoin accounting (2026)